INTER-MOUNTAIN WATERSHED DISTRICT

  • Home
  • Latest News
  • Programs Offered
    • Application Forms
    • Grow Program
  • Maps
    • IWMP's
  • Lidar
  • Completed Projects
    • Infrastructure Projects
    • Conservation Projects
  • Education
    • Water Festival
    • Scholarship
    • Memorial Park
    • Retention Dams
    • Crawford Creek Alluvial Fan Boardwalk
  • Contact
    • Board & Sub-District
  • Home
  • Latest News
  • Programs Offered
    • Application Forms
    • Grow Program
  • Maps
    • IWMP's
  • Lidar
  • Completed Projects
    • Infrastructure Projects
    • Conservation Projects
  • Education
    • Water Festival
    • Scholarship
    • Memorial Park
    • Retention Dams
    • Crawford Creek Alluvial Fan Boardwalk
  • Contact
    • Board & Sub-District

Infrastructure Projects 


Kergwenan Crossing

Picture

Culvert Crossing​
Year: 2019

​Location: NE of NE-36-22-15w 
​The crossing was previously an old wooden bridge on a municipal roadway that was in rough condition and unsafe to use. It was removed and replaced with 3, 2200mm culverts. 
Cost: $63,343.35
Picture

Kerosene Drain Clean out

Picture

Drain Clean out
Year: 2020
Location: E 26-24-17w

A drain cleanout was done on the kerosene drain due to it being full of soil and cattails. The drain was brought back to its original specs. 
​Cost: $16,300.37
Picture

New Culvert on Bennet Drain 


New Culvert
Year: 2021
Location: SE 18-24-16w

New 450mm culvert with automatic flood gate installed to alleviate water that jumps the dyke in a high water event, causing flooding on agricultural land. 
Picture
Picture

Culvert Crossing on W. Boundary drain 

Picture

​New Culvert Crossing
Year: 2020
Location: North of NW 34-21-16w

The crossing was previously an old timber bridge that was in rough condition and unsafe to use. Due to the landowner having a cattle barn with livestock on the property that needed access to, this was an emergency replacement. The old bridge was removed and replaced with 2, 1400mm culverts. 


Picture

Mckinnon Creek brushing

Picture

Brushing
Year: Ongoing brushing at various locations

Location: NE 8-21-15w and NW 9-21-15w
Brushing was needed along the Mckinnon creek due to willows hanging in the water, causing it to slow down, and fill in with shale and other sediments. 


Picture

Culvert Crossing on Reave drain

Picture

Culvert Crossing
Year: 2019
Location: NE 8-20-15w

The crossing was previously an old timber bridge on a municipal roadway that was in rough condition and unsafe to use. The old bridge was removed, and replaced with 2, 1800mm culverts
Cost: $37,393.34 
Picture

Rosenbarker drain- Ongoing issues

Picture

Erosion issues
Year: Ongoing

Due to the steep topography along with Riding Mountain National park, the Rosenbarker drain has been dealing with ongoing erosion issues. High water events and spring runoff erode shale from these drains and it gets carried downstream where it eventually fills in and changes the formation of the drain. Many of these drains were constructed 50+ years ago and have filled in with shale and other sediments throughout the years to the point where they are no longer able to operate like they were intended to. These cleanouts required on the drains are expensive due to the amount of spoils that are removed from the drain. 
Picture
Picture
Picture
Picture

Wilson Creek shale cleanout

Picture
Shale Cleanout
Year: Ongoing

Ongoing shale cleanout being done on the Wilson creek. 