Infrastructure Projects
Kergwenan Crossing
Kerosene Drain Clean out
New Culvert on Bennet Drain
Culvert Crossing on W. Boundary drain
New Culvert Crossing
Year: 2020 Location: North of NW 34-21-16w The crossing was previously an old timber bridge that was in rough condition and unsafe to use. Due to the landowner having a cattle barn with livestock on the property that needed access to, this was an emergency replacement. The old bridge was removed and replaced with 2, 1400mm culverts. |
Mckinnon Creek brushing
Culvert Crossing on Reave drain
Rosenbarker drain- Ongoing issues
Erosion issues
Year: Ongoing Due to the steep topography along with Riding Mountain National park, the Rosenbarker drain has been dealing with ongoing erosion issues. High water events and spring runoff erode shale from these drains and it gets carried downstream where it eventually fills in and changes the formation of the drain. Many of these drains were constructed 50+ years ago and have filled in with shale and other sediments throughout the years to the point where they are no longer able to operate like they were intended to. These cleanouts required on the drains are expensive due to the amount of spoils that are removed from the drain. |